GWM ORA vs Leapmotor B05
Two electric Hatchbacks go head to head. Which EV is the better buy for Australian drivers in 2026?
Leapmotor B05 scores higher, 76 vs 75
Prices are RRP before on-road costs unless stated otherwise. Always confirm with the manufacturer or dealer before purchasing.
Data checked: specs 28 Aug 2026, price 8 Oct 2026

GWM ORA
15 of 27 standard · no option data · 12 no dataFrom
$31,990
RRP, before on-road costs
- Body
- Hatchback
- Fuel type
- Electric
- Engine
- Electric
- Power
- 126kW
- Energy use
- 16.6 kWh/100km
- Safety
- ANCAP ★5 · 2022
- Boot (seats up)
- 228L
Free. Email alerts on price and offer changes.
Car loan ratesDriva is an independent finance provider, not part of CarSorted. We aren't paid for this link.
Overseas model shownLeapmotor B05
16 of 27 standard · no option data · 11 no dataFrom
$35,990
RRP, before on-road costs
- Body
- Hatchback
- Fuel type
- Electric
- Engine
- Electric Motor
- Power
- 160kW
- Energy use
- 15.8 kWh/100km
- Safety
- ANCAP ★5 · 2026
- Boot (seats up)
- 357L
Top CarSorted Score, 76 vs 75, but the GWM ORA is $4,000 cheaper
Leapmotor Australia offer: $35,990 drive-away (state not stated), ends 31 Dec 2026. Terms
Free. Email alerts on price and offer changes.
Car loan ratesDriva is an independent finance provider, not part of CarSorted. We aren't paid for this link.
Manufacturer offer
Ends 31 Dec 2026
Manufacturer's terms: while stocks last
Offer from Leapmotor Australia, checked 12 Nov 2026
T&Cs apply, as the manufacturer prints them. Eligibility, stock and build limits vary, so confirm the offer with the dealer.
Leapmotor B05: we're still completing transmission, turning circle, braked towing and energy consumption.
A blank cell below means we don't have that figure, not that the car scores badly on it. We leave them empty rather than estimate, so any row where one car is blank isn't a like-for-like comparison yet.
$31,990RRP
- no option data for this car
$35,990RRP
- no option data for this car
Printed option prices only. A pack is counted once and makes the figure a floor when it carries no printed price. Nothing is inferred from the other car.
Price and cost per week
GWM ORA Lux
$31,990
RRP, before on-road costs. Checked 25 June 2026
$34,990 drive-away in VIC, as published by GWM Australia
Leapmotor B05 Style
$35,990
RRP, before on-road costs. Checked 8 Oct 2026
$35,990 drive-away in VIC, as published by Leapmotor Australia
No lowest cost is named: these totals leave out different parts (2026 GWM ORA Lux excludes insurance; 2026 Leapmotor B05 Style excludes servicing and insurance).
Every column on the same basis: 15,000 km a year (fixed for every comparison) in VIC, repayment assumes $5,000 deposit, 5 yrs at 7.5% p.a. Each car's fuel or charging price is in its own breakdown. Estimate only, not a quote or an offer of credit.
No lowest cost is named: these totals leave out different parts (2026 GWM ORA Lux excludes insurance; 2026 Leapmotor B05 Style excludes servicing and insurance).
Cash outlay over 5 years: the deposit, the repayments and the running costs. Excludes resale value. Every column on the same basis: 15,000 km a year in VIC, repayment assumes $5,000 deposit, 5 yrs at 7.5% p.a. Estimate only, not a quote or an offer of credit.
Standard features per $10,000: not ranked, too few features are known for both cars. On the rated figures, the GWM ORA leads on price per km of range: $80 per km of range on RRP for the GWM ORA; $90 per km of range on RRP for the Leapmotor B05. On the rated figures, the Leapmotor B05 leads on price per kw: $254 per kW on RRP for the GWM ORA; $225 per kW on RRP for the Leapmotor B05. On the rated figures, the Leapmotor B05 leads on price per litre of boot: $140 per litre of boot on RRP for the GWM ORA; $101 per litre of boot on RRP for the Leapmotor B05. These ratios are not part of the CarSorted Score.
The GWM ORA starts $4,000 lower on RRP.
Both models currently qualify for the electric-vehicle Fringe Benefits Tax exemption (battery-electric and under the $91,661 threshold; battery-electric and under the $91,661 threshold), which applies to salary-sacrificed novated leases.
On-road costs (stamp duty, registration, CTP and dealer delivery) depend on your state and the dealer; ask for a written drive-away price before you sign.
CarSorted
Track the GWM ORA
Free, and we email you when the price or a manufacturer offer changes.
Ways to buy
For the 2 cars on this page.
Free. Email alerts on price and offer changes.
Finance
From ≈$139/wk(≈$601/mo)
Estimate on the GWM ORA at $34,990 drive-away; assumes $5,000 deposit, 5 yrs at 7.5% p.a. Not a quote or an offer of credit.
Compare real car-loan ratesDriva is an independent finance provider, not part of CarSorted. We aren't paid for this link.
Novated lease
Electric, with an RRP under the $91,661 fuel-efficient LCT threshold (2026-27): under the ATO's electric cars exemption a novated lease of an eligible electric car attracts no FBT if luxury car tax was never payable on it. The benefit is still reportable.
Novated lease quoteWork out a lease on the GWM ORADriva is an independent finance provider, not part of CarSorted. We aren't paid for this link. Opens apply.driva.com.au in a new tab.
Safety Rundown
ANCAP lists the GWM ORA at 5 stars (2022) and the Leapmotor B05 at 5 stars (2026). ANCAP tested these in different years (2022 vs 2026). Its criteria get stricter about every three years, so the stars are not like for like.
Where the two diverge is in active safety technology. We can confirm 7 of 10 key ADAS systems on the GWM ORA, against 6 on the Leapmotor B05.
Both include the essentials: autonomous emergency braking, lane keep assist, adaptive cruise control, a reversing camera.
Driver assistance, as the manufacturer lists it
Driver assistance, system by system. We can confirm 7 of 10 key systems on the GWM ORA and 6 on the Leapmotor B05.
Swipe across. Tap a feature to see what it does and each car's source.
StandardOptional: printed price, +pack or NCO (no-cost)No, not offeredNo dataCounts beside each car use the same colours; ? is no option data.
From each manufacturer's Australian equipment list. No data means that car's document does not say. The drawings are our own illustrations of how each kind of system works.
Recalls on our record
GWM ORA
- REC-005843 · published 4 Dec 2023Due to a programming issue, if the operator removes the charging cable without cancelling the charge, an electrical arc between the charging plug and the vehicle may occur.Year range on the notice: 2023
Leapmotor B05
None open on our record
A recall covers the builds its notice lists, not every car of a model. Check your VIN at vehiclerecalls.gov.au.
Charging and range
The rated figures side by side: electric range and fuel use with the battery depleted for a plug-in hybrid or range extender, the km each battery-electric car adds overnight on its own onboard charger, and the DC time in the window each document prints.
| 2026 GWM ORA Lux | 2026 Leapmotor B05 Style | |
|---|---|---|
| Powertrain | Battery electric | Battery electric |
| Added overnight, 10A power point (2.4 kW)Level: within 5%. | 145 km in 10 h | 152 km in 10 h |
| Added overnight, 7.4 kW wallbox | 358 km in 10 hCapped: this car accepts 6.6 kW AC, a full battery | 468 km in 10 h |
| Added overnight, 11 kW three-phase | 358 km in 10 hCapped: this car accepts 6.6 kW AC, a full battery | 696 km in 10 h |
| DC fast charge, as printedNo data for the Leapmotor B05. | 35 min, 0-80% | No data |
| Charging connector | CCS2 | No data |
| Portable charger supplied | No data | No data |
| Type 2 cable supplied | No data | No data |
| Front boot | No data | No data |
- Km added in 10 hours: the charger rate, capped by the car's own onboard charger, over its own rated energy use. A car without an onboard charger or energy figure is No data, never an assumed rate.
- DC times are printed only in the window the document gives (0-80% or 10-80%). Different windows are not one measure, so nobody leads across them.
How long each takes to charge, from a household power point to a DC fast charger, estimated from battery size and the car's own maximum charge rates.
How long to charge
59kWh usablePublic DC
50kW charger · 0–80%
Ultra-rapid DC
up to 80kW · 0–80%
Estimates from usable battery size and the car's max charge rates (6.6kW AC, 80kW DC). Real times vary with temperature, starting charge, charger output and the charging curve.
How long to charge
56.2kWh usablePublic DC
50kW charger · 0–80%
Ultra-rapid DC
up to 156kW · 0–80%
Estimates from usable battery size and the car's max charge rates (11kW AC, 156kW DC). Real times vary with temperature, starting charge, charger output and the charging curve.
Feature Showdown
The GWM ORA features a 10.3-inch touchscreen paired with a 10.3-inch digital dash, while the Leapmotor B05 gets a 14.6-inch display and 8.8-inch instruments. Apple CarPlay and Android Auto are standard across both.
The Leapmotor B05 counters with wireless charging and V2L. Which feature set matters more depends on your daily routine and priorities.
Equipment few rivals have, on either carShowHide
Drivetrain
The GWM ORA uses a Electric producing 126kW and 250Nm of torque, sent through a auto to a FWD layout. It covers the 0-100km/h sprint in 8.4 seconds.
The Leapmotor B05 counters with its electric setup making 160kW and 240Nm, paired to its gearbox driving the rear wheels. It gets to 100km/h in 7.5 seconds.
The Leapmotor B05 has the clear power advantage at 160kW vs 126kW. In the 0-100 sprint (manufacturer-claimed), the Leapmotor B05 is 0.9s quicker. For most buyers, the way each car feels day-to-day matters more than outright acceleration.
Battery: 57.7kWh (GWM ORA) vs 56.2kWh (Leapmotor B05), giving WLTP ranges of 347km and 401km. DC fast charging peaks at 80kW (GWM ORA) vs 156kW (Leapmotor B05).
Space & Comfort
The GWM ORA measures 4,235mm long on a 2,650mm wheelbase, 195mm shorter than the Leapmotor B05 at 4,430mm (2,735mm wheelbase). The longer wheelbase on the Leapmotor B05 generally means more rear legroom.
Boot space is 228L in the GWM ORA and 357L in the Leapmotor B05, giving the Leapmotor B05 a 129L advantage.
The GWM ORA turns in a 11.2 m circle, kerb to kerb; the Leapmotor B05's turning circle is not on our record.
Front boot (frunk)
GWM ORA
No data
Leapmotor B05
No data
Cost to own
At 15,000 km a year, electricity for the GWM ORA costs about $743 a year (16.6 kWh/100km, at $0.30/kWh electricity) and electricity for the Leapmotor B05 about $711 a year (15.8 kWh/100km, at $0.30/kWh electricity). That is $32 a year less for the Leapmotor B05.
The weekly and 5-year figures in the price section above add repayments, rego, servicing and tyres to this; use our Fuel Cost Calculator for your own driving.
Warranty: 7 years / unlimited km (GWM ORA) and 6 years / 150,000 km (Leapmotor B05).
- The Leapmotor B05 costs $4,000 more on RRP and $29 a year less in energy at 15,000 km a year: the gap closes only beyond 300,000 km.
Energy only. Excludes servicing, rego, insurance, finance interest and resale. Prices are compared only on one basis.
Where each one leads
The GWM ORA: the lower starting price ($31,990 against $35,990) and the longer warranty (7 years against 6).
The Leapmotor B05: more power (160kW against 126kW), the bigger boot with the seats up (357L against 228L) and lower fuel or energy costs on our assumptions ($711 a year against $743).
The Verdict
Leapmotor B05 scores higher, 76 vs 75
The Leapmotor B05 scores 76 to the GWM ORA's 75 on the CarSorted Score, and leads 6 of the 9 spec rows that separate them. The biggest gaps: practicality (Leapmotor B05 ahead by 8 points), performance (Leapmotor B05 ahead by 7 points), energy efficiency (Leapmotor B05 ahead by 5 points). At 15,000 km a year, electricity for the Leapmotor B05 costs about $32 less (15.8 kWh/100km against 16.6 kWh/100km, at $0.30/kWh electricity). Boot space with the seats up: 228L in the GWM ORA, 357L in the Leapmotor B05. Warranty: 7 years on the GWM ORA, 6 on the Leapmotor B05.
Common questions
Which is cheapest, GWM ORA and Leapmotor B05?
The GWM ORA is the cheapest at $31,990 before on-road costs. That undercuts the Leapmotor B05 by $4,000.
Which has the longest driving range?
The Leapmotor B05 has the most range at 401km (WLTP).
Which charges fastest?
The Leapmotor B05 accepts the highest DC charging at up to 156kW.
What are the ANCAP safety ratings?
GWM ORA holds a 5-star ANCAP rating (tested 2022) and Leapmotor B05 holds a 5-star ANCAP rating (tested 2026). ANCAP tested these in different years (2022 vs 2026). Its criteria get stricter about every three years, so the stars are not like for like. Compare the active-safety features above to separate them.
Which has the most boot space?
The Leapmotor B05 has the largest boot at 357L with the seats up.
Which has the best warranty?
The GWM ORA has the longest warranty at 7 years / unlimited km.
Which is the most powerful?
The Leapmotor B05 makes the most power at 160kW. The Leapmotor B05 is quickest to 100km/h in 7.5s.
Track the GWM ORA & Leapmotor B05
Get price-drop alerts on these models plus our free weekly new-car rundown. Unsubscribe anytime.
How to read this page. Prices, specifications, ANCAP ratings, warranty, the CarSorted Score and the verdict come from our records for the grades shown, sourced from the manufacturers' Australian documents, and change when those records change; the date each was last checked is printed under the headline. Prices are recommended retail prices before on-road costs unless marked drive-away. A plug-in hybrid's fuel figure is labelled with its basis: with a full battery (the certified combined figure) or as a hybrid (battery depleted). Charging and running costs are estimates on the stated assumptions. Always confirm price and specification with the manufacturer or dealer before you buy. CarSorted does not accept payment for recommendations.
Comments (0)
Sign in to join the conversation
No comments yet. Be the first!
